Verbatim source text

Source page 158

Applied Technology Curriculum (SHS) · Applied Technology

Printed page 156 · PDF page 158 · 39 lines · 3,563 characters

                          3.3.2.LI.4                                                                                     3.3.2.AS.4

                          Explain the schedule of works involved in installing Cold Water.                               Level 1 Recall
                          Communication: Organize a whole class and let learners outline the schedule of tasks           Level 2 Skills of conceptual
                          involved in Cold-water Supply                                                                  understanding
                                                                                                                         Level 3 Strategic reasoning
                          Collaboration: Identification of ability and positioning to ensure mixed ability. Through      Level 4 Extended critical
                          structured grouping [GESI] ask Learners to discuss the schedule of works involved in           thinking and reasoning
                          Cold-water Supply to the building. This method is to ensure effective participation in
                          teaching and learning by different categories of Learners including Approaching
                          Proficiency, the Proficient and the Highly Proficient.

                          Experiential Learning: Embark on a field trip to a Site where Services Works are
                          going on for Learners to observe or learn about schedule of works involved in the
                          installation of Cold-water Supply.

                          For Cold Water Supply Learners will observe and report on;                                     3.3.2.AS.5
                              1. The agreement signed by both Services providers and the Owner of the
                                   property.
                              2. The variety of materials, appliances, fixtures and fittings such as pipes of different
                                   sizes, meter, stop valves, storage cisterns, taps etc. provided for water supply.
                              3. The order or sequence of installing these fixtures and appliances.
                              4. The ducts, trunking and excavations done to contain service lines.

                          3.3.2.LI.5

                          Explain the schedule of works involved in installing Waste Disposal.                           Level 1 Recall
                                                                                                                         Level 2 Skills of conceptual
                          Communication: Organize a whole class and let learners distinguish between liquid              understanding
                          waste and solid waste.                                                                         Level 3 Strategic reasoning
                                                                                                                         Level 4 Extended critical
                          Collaboration:                                                                                 thinking and reasoning
                          • Identification of ability and positioning to ensure mixed ability. Through structured

                              grouping [GESI] ask Learners to discuss the schedule of works involved in disposal of
                              liquid waste. This method is to ensure effective participation in teaching and learning

156 | APPLIED TECHNOLOGY