by different categories of Learners including Approaching Proficiency, the Proficient
and the Highly Proficient.
• Identification of ability and positioning to ensure mixed ability. Through structured
grouping [GESI] ask Learners to discuss the schedule of works involved in disposal of
solid waste. This method is to ensure effective participation in teaching and learning
by different categories of Learners including Approaching Proficiency, the Proficient
and the Highly Proficient.
Experiential Learning: Embark on a field trip to a Site where Services Works are
going on for Learners to observe or learn about schedule of works involved in the
installation of waste disposal services.
For Waste Disposal (Solid and Liquid) Learners will observe and report on; 3.3.2.AS.6
1. The variety of materials, appliances, fixtures and fittings such as drain pipes and
valves of different sizes, WCs etc. provided for disposal of Waste.
2. The order or sequence of installing these fixtures and appliances.
3. The construction of manholes to change direction and regulate gradient of flow,
septic tank and soak-aways to treat solid waste and internal drains to link public
drains
3.3.2.LI.6
Explain surface drainage system Level 1 Recall
Level 2 Skills of conceptual
Collaboration: Identification of ability and positioning to ensure mixed ability. Through understanding
structured grouping [GESI] ask Learners to explain surface drainage system. This method Level 3 Strategic reasoning
is to ensure effective participation in teaching and learning by different categories of Level 4 Extended critical
Learners including Approaching Proficiency, the Proficient and the Highly Proficient. thinking and reasoning
Collaboration: Identification of ability and positioning to ensure mixed ability. Through
structured grouping [GESI] ask Learners to outline types of surface drainage system.
Collaboration: Identification of ability and positioning to ensure mixed ability. Through
structured grouping [GESI] ask Learners to discuss the benefits of surface drainage
system.
APPLIED TECHNOLOGY | 157
You are offline. Pages you have already opened stay available.