2. Electricity Supply which conducts electrical energy to fixtures, fittings and appliances
such as air-conditioners and Lighting bulbs through cables with adequate insulations
so as not to allow leakage and cause electric shocks.
3. Waste Disposal System which ensures sanitation by disposing liquid and solid waste
through the WC, manhole, septic tank, soak-aways and the public drain system.
This method is to facilitate effective participation by different Learners, namely, the 3.3.2.AS.3
Approaching Proficiency, the Proficient and the Highly Proficient.
3.3.2.LI.3 Level 1 Recall
Explain the schedule of works involved in installing Electricity. Level 2 Skills of conceptual
understanding
Communication: Organize a whole class and let learners outline the schedule of tasks Level 3 Strategic reasoning
involved in installing electricity. Level 4 Extended critical
thinking and reasoning
Collaboration: Identification of ability and positioning to ensure mixed ability. Through
structured grouping [GESI] ask Learners to discuss the schedule of works involved in the
installation of electricity in the building. This method is to ensure effective participation
in teaching and learning by different categories of Learners including Approaching
Proficiency, the Proficient and the Highly Proficient.
Experiential Learning: Embark on a field trip to a Site where installation of electricity
is going on for Learners to observe or learn about schedule of works involved in the
installation of electricity.
For Electricity Supply Learners will observe and report on;
1. The agreement signed by both Services providers and the Owner of the property.
2. The variety of materials, appliances, fixtures and fittings such as poles, cables of
different sizes, meter, consumer unit with circuit breakers, earthing materials and
thunder arresting materials etc. provided for installing Electricity.
3. The order or sequence of installing these fixtures and appliances.
4. The safety precautions integrated by including wiring for earthing, lightning arrestor
and circuit breakers.
5. The ducts, trunking and excavations done to contain service lines
APPLIED TECHNOLOGY | 155